Model:MR-DG300
Features
Specifications:
| Model | Hydraulic Pressure Controlled Rolling Press Machine MR-DG300 |
|---|---|
| Working Voltage | 220V |
| Max. Power Consumption | 2KW |
| Rollers (one pair) | Dimensions: 200mm (Dia.) x 330mm(W) Material: Hardening Toll Steel above HRC65 Effective Rolling Width: <280mm |
| Press gap | 0 - 2 mm adjustable by Dual micrometer knobs Tolerance: 0.003mm |
| Rolling Speed | Max.6m/min adjustable by Touch Screen Control Panel |
| Roller Surface Hardness | 65 HRC Never roll materials with hardness>50HRC |
| Press Planeness | ±0.0025mm |
| Pressure Control | Pressure load: 1 - 25 Tons adjustable by Touch Screen Control Panel Real time pressure displays with data recording function |
| Rectifying Sensor | Built in Rectifying Sensor to ensure neatly reeling electrode foil after pressing |
| Compressed air | 0.5-0.8MPa Compressed air required (Air compressor is not included) Attention: If a gas cylinder is used instead of air compressor(pic2), a two-stage pressure regulator(pic1) must be installed on the gas cylinder to limit the pressure within the required working range for safe operation. |
| Rolling Unit Dimensions | Rolling Machine: 1400mm(L) x500mm(W) x 1300mm(H) |
| Warranty | One-year limited warranty with lifetime support Rusting and damage due to improper storage condition or maintenance are not covered by warranty |
| Application Notes | Never roll materials with hardness >50HRC Must use acetone to clean and dry rollers' surfaces after each use to avoid rusting Multi-step thickness calendering needed: While calendering the sample sheet, make each calendering decrement of 0.02mm comparing to sheet original thickness. Roll and press the electrode sheet multiple times to condense the slurry. Apply antirust if machine were to be unused for a long period of time Sample testing is available upon customer's request It is not allowed to use any MRBEST product in any hazardous location, especially prohibit from using in Class I environments (flammable gasses & vapor) |
Maintenance methods and precautions
Safety operation procedure